Thursday, January 27, 2011

The inside back wall of a typical hose we are building here

There are two grade beams in this construction and 4 vertical reinforced columns in this wall. The scaffolding shown  is typically used. The finish is  two inches of concrete on the floor and a water based (similar to a whitewash) paint on the walls. The inside of this house will be sky blue.